South Iredell High School AquaLab Construction – Part 2

After our last post, Ron Morgan engaged students at SIHS who are eagerly waiting for the AquaLab to be complete. Topics covered ranged from food to culture to international outreach.

IMG_20140417_124601_671
Ron Morgan speaking to students at SIHS

Construction of the two raft hydroponic systems and the fish tank stands have started. The pond liners have been cut and inserted into their wooden frames. The frames have a horizontal support beam to prevent bowing when filled with water.

IMG_20140506_145642_980
Wooden frames for the raft hydroponic units being constructed.
IMG_20140723_140908_306
Liners laid inside frames
IMG_20140724_144653_830
Raft hydroponic units filled with water and being tested for leaks

The fish tank stands will be raised to allow for gravity draining into the greenhouse hydroponic units. This will raise the tanks for maximum viewing.

IMG_20140506_124518_684
600 gallon fiberglass tank with viewing window
IMG_20140506_124529_916
Two circular tanks which will mimic the engineering one would see in a commercial fish farm

 